Latest News
Mansycom has received LOI from L&T WET (Water & Effluent Treatment) IC (Independent Company), Chennai for supply of Trimble Vico licenses (5D BIM software package) and providing services for implementation of 5D BIM simulation technology for their upcoming EPC contract for developing 403 MLD Surya Regional Bulk Water Supply Scheme on design, build, maintain, operate and transfer basis for Mumbai Metropolitan Regional Development Authority (MMRDA) at a cost of Rs 1,329.00 crores.  |  Mansycom successfully completed implementation of 5D BIM modeling at L&T DLF Cyber Park Project, Gurugram, using Trimble’s Vico Software  |  Mansycom has reached greater heights in 3D BIM and 4D-5D Simulation by getting first Smart City Project within Mumbai City i.e Saifee Burhani Upliftment Project located at Bhendi Bazaar, Mumbai  |  Mansycom has awarded as BIM Design and Modeling Agency for Nagpur Metro Rail Project, Nagpur, Maharashtra  |  Mansycom assist as a off-shore services partner for 3D BIM modeling support on Riyadh Metro project  |  Trimble has recently made available the new release of Vico Office, release 6. In the new Vico Office, the installer has been shrunk to nearly half its previous size. It also includes an overhaul of the Takeoff Manager module.  |  V-Ray 3 for SketchUp – Now Available in India! V-Ray 3 for SketchUp has been redesigned from the ground up to help you focus on being creative without worrying about the technical stuff. The new user interface is clean and simple, with quick presets and streamlined controls. Now, it's faster and easier than ever to create great looking renders right in SketchUp

Our Work

Healthcare

Sports Injury Centre

Project:
Sports Injury Centre, Safdarjung Hospital, New Delhi

Scope:
Creation of 3D model to ensure coordination of architectural, structural & MEPF services design drawings.




Hospital Building of Central Armed Police Force

Project:
Hospital Building of Central Armed Police Force Institute of Medical Sciences (CAPFIMS), CPWD

Scope:
Scope includes creation of 3D BIM architectural, structural and MEPF model elements at LOD 300 level of details, clash detection between different disciplines & resolution of the hospital building of two level basement + GF + 10 upper floors; having total built-up area of 17.50 lakh sqft.