Mansycom Consultants, the Lead Partner of M-N-E Consortium has successfully steered implementation of Integrated Project Monitoring Solution (IPMS) at DMRC’s Phase IV expansion & other upcoming metro projects, which has gone-live on April 23, 2021. Now under 60 month maintainance. || Integration & coordination of engineering design of an industrial plant at Bawal, Rewari including of process plant facilities, achieved using 3D BIM technology for AECOM. || Implementation & maintenance support for Common Data Environment (CDE) on cloud & 5D BIM simulation using Trimble Vico Office Suite; for the purposes of engineering coordination, construction time & cost control; carried out satisfactorily for a period of 3 years; for an infrastructure project i.e. 403 MLD Surya Regional Bulk Water Supply Scheme, Thane, costing Rs 1,329.00 crores, of MMRDA under execution by L&T’s WET (Water & Effluent Treatment) IC (Independent Company), Chennai as an EPC contact, between Feb 2017 to Mar 2021. || Mansycom successfully completed implementation of 5D BIM modeling at L& T DLF Cyber Park Project, Gurugram, using Trimble’s Vico Software in the year 2017. || Mansycom has reached greater heights in 3D BIM and 4D-5D Simulation by executing Sub-cluster 03 consisting of twin towers of 37 & 43 storeys respectively of first SmartCity Project within Mumbai City i.e Saifee Burhani Upliftment Project located at Bhendi Bazaar, Mumbai between November 2015 to March 2021. || Mansycom has executed 3D BIM modelling work of 8 metro stations, including of two iconic metro stations - Sitaburdi & Zero Mile, for Nagpur Metro Rail Project, Nagpur of MAHA-Metro, for a French architectural firm – Enia Design ||

Services

6D and 7D BIM

SUSTAINABILITY

Mansycom Consultants recommends utilization of 6D BIM (6th dimensional building information modeling) for performing energy consumption analyses. The utilization of 6D BIM simulation can result in accurate energy estimates at an earlier stage in the planned procedure. It also allows for measurement and verification during building occupation, and enhanced procedures for gathering exercises learned in elite facilities.

  • Advantages

Integrating BIM model into an intelligent Sustainability Management System leading to an overall decrease in energy consumption.


FACILITY MANAGEMENT

Mansycom Consultant supports 7D BIM (7th dimensional building information modeling) which is being utilized in the operation and maintenance of the facility for the duration of its life cycle. The seventh element of BIM allows participants to extract and track relevant asset data, for example, segment status, specifications, maintenance/ operation manuals, warranty data etc.

The utilization of 7D BIM innovation can result in easier and snappier parts replacements, optimized compliance and a streamlined asset lifecycle management after some time. 7D BIM gives procedures to managing provider data and facility part through the whole facility life cycle.

  • Advantages

Integrating BIM model with Facility Management System that helps in optimizing asset management from plan to obliteration.